TRESIA CONNECT · SPECIAL CROSSINGS
Alpine tunnels for abnormal loads
Support checking and organising transits through the main European road tunnels into Italy, such as Mont Blanc and Fréjus, based on the convoy and the operators’ conditions.
We collect dimensions, weight, route and dates to assess procedures, any prior authorisation and how the crossing can be made.
Information: +39 055 211 533

THE SERVICE
A crossing that needs careful preparation
Ordinary vehicles may follow standard toll and access rules. For abnormal loads, conditions depend on the individual tunnel, the size of the load and the operator’s rules. Checking in advance avoids mistaking a simple transit request for a permit already granted.
Convoy check
Actual dimensions, weights, axles, configuration and type of load are the starting point.
Conditions check
We review requirements, transit time slots, any restrictions and the documents required.
Operational coordination
We support the request to the tunnel operator and link it with permits and pilot cars when needed.
TUNNELS AND CORRIDORS
Alpine tunnels and European links into Italy

Crossings to assess include the Mont Blanc Tunnel, the Fréjus Tunnel and other tunnels along the route. Each infrastructure has its own rules: transit is not automatic and must be confirmed for the specific convoy.
For example, the Fréjus and Mont Blanc operators have dedicated procedures for abnormal loads. Conditions can change because of works, safety measures or temporary restrictions; we never present a booking as confirmed before the check is complete.
See the operators’ information: Fréjus – SFTRF · Mont Blanc Tunnel.
HOW WE WORK
From request to tunnel transit check
01 · Technical data
We receive start and end points, planned date, vehicle technical data, convoy dimensions and type of load.
02 · Preliminary check
We check the corridor, identify the operators involved and the conditions to confirm before transit.
03 · Operational answer
We report the outcome and any procedures, conditions or alternatives to handle.
FREQUENTLY ASKED QUESTIONS
What to know before a tunnel transit
Can an abnormal load go through any tunnel?
No. Whether it can pass depends on size, weight, convoy configuration, the conditions of the infrastructure and any permits required.
Is paying the toll enough?
Not necessarily. Oversize or overweight convoys may need a prior procedure that is separate from paying the toll.
What information do you need for a check?
Route and planned dates, height, width, length, gross weight, number of axles, type of load and any documents you already have.
TRESIA CONNECT · A DEPARTMENT OF TRESIA S.R.L.
Planning a tunnel transit into Italy?
Send us the route and convoy data. We will check which crossings and procedures need attention, without promising permits or availability that are not confirmed.
For the road legs see also Abnormal load permits in Italy and Permits and pilot cars in Europe.